Terms and Conditions

Pricing and Payments

  1. Customer is responsible for any additional fees assessed by the landfill for

certain items such as, tires, mattress, appliances, etc. Appliances are

taken with prior arrangement only.

  1. If the trailer is kept longer than agreed days there will be an additional fee

of $25 a day.

III. Payment for all base fees as well as any known additional rental time will

be due upon delivery of the trailer. Any additional fees due to overweight

or other fees not paid upon delivery are due within 14 days of trailer pick

up.

  1. Any unpaid balance after 14 days will start to accrue 15% interest from

the date of trailer pick up until paid in full. There will be a minimum of a

$25 late fee.

  1. Dry Run fee up to $250 will be assessed if we get to a site and cannot deliver due

conditions of the customer and/or requested location

Dumpster Use

  1. While dumpster trailers are in your possession, you will NOT place or allow the

following to be placed into the dumpster:

Substances hazardous to health such toxic or corrosive materials or liquids.

Liquids of any kind whether contained or not.

Cans, drums or other trailer of any kind unless emptied and crushed

and incapable of carrying any liquid.

Medical waste or animal carcasses of any kind.

Any material not listed above however considered unsuitable for containment e.g.

malodorous

waste: asbestos, paint, tires, gas bottle, fluorescent tubes, light bulbs, vehicle

batteries,

household appliances such as but not limited to refrigerators, conventional ovens,

microwave, ovens, washer, dryer.

Extremely heavy material such as rock, dirt, or concrete. Please let us know and we

can help you dispose of such heavy items in a more efficient manner. Shingles ARE

allowed with prior arrangement.

  1. All debris/refuse shall remain within the confines of the dumpster and shall not

exceed the top or sides. Every attempt shall be taken to equally disperse the weight

of the refuse within the dumpster.

III. Customer shall be liable for any loss or damage to rented equipment in excess of

reasonable wear and tear.

  1. If any prohibited items are found in the dumpster trailers, the customer will be

liable for the extra cost incurred to dispose of these items. If any prohibited items

are found in trailer at the time of pickup, KAGE Dumpsters, LLC can refuse to

pickup the dumpster trailer, until these items are removed by the customer.

V.Mixed loads such as including garbage with prohibited items(bricks, shingles, etc)

are not allowed. If a mixed load occurs, the customer will be charges $50 per/hr for

labor to separate the load.

Access & Ground Conditions

  1. The Customer will be responsible for the provision of free and suitable access to

and from the delivery site (including the removal and reinstatement of local

obstructions) and for ensuring suitable ground conditions for delivery, placement

and removal of the dumpster. No responsibility will be accepted for the damage to

any surface and you should therefore take steps to protect surfaces (e.g. paving

slabs, soft ground) before delivery.

  1. Should the trailer cause damage to concrete or asphalt during loading or

unloading. KAGE Dumpsters, LLC is only responsible if this is due to our negligence.

We have specifically identified that heavy trailers may cause damage and that the

placement of these heavy trailers.

III. Should the Customer fail to return the trailer, KAGE Dumpsters, LLC maintains

the right to enter upon the premises where the trailer may be without notice and

take possession of and remove it at the customerʼs expense all without legal

process, the customer hereby waving any claims for damages from any such entry or

removal.